Friday, September 2, 2022

La Dame Du Lac

View showing the step up to the upper deck.  Second layer of plywood installed.
Installing first layer of the coaming.  Two coats of primer.
The hull receives a layer of 6oz cloth as a final protective coat.  The problem with installing vertical fiberglass cloth is the basket weave shows through.  If you try to add enough epoxy to cover the basket weave you will have runs and basket weave.  So multipole coats of primer plus fairing between coats is the next process.

 Helm station being fitted.  All the motor and steering cables will run along the starboard side.

La Dame Du Lac

Found a good deal on a trailer.  Old but has been fitted with new axles, springs, tires & rims and completely rewired. 
The boat was relatively easy to install on the trailer.  I attached a new winch strap and with a little help from my floor jack to raise the stern she slid right up on the trailer.
Port side showing the blower, step up to the upper deck and fill line for the water tank.
The second layer of plywood laid at 90 degrees to the first layer and overlapping the seams gets a lot more labor intense..  In order to add extra rigidity to the hull I added a layer of 6oz fiberglass cloth against the first layer and then laid the second layer over the cloth before the epoxy had set. The screws are #6x1" three inch on center.  Each row follows a stringer  Once the epoxy is somewhat cured the screws are backed out and the fender washer removed.  The screws are then reset into the hull.   
 

La Dame Du Lac

Starting to frame the cuddy deck.  I opted to eliminate the camber which made the framing much easier.
The photo shows the transom in the motor well.  The two smaller girders behind the transom were removed as they did not leave enough room for the motor (Honda 60) to turn.
At this point my son came to visit and we ran all the wires for the electrical system.
Got a little behind on photos.  The starboard side has received its first layer of 1/4" plywood.
 

La Dame Du Lac

Unfortunately during turn over the crew was rather busy and no one thought to take pictures.  You can see the upright pole with the chain from the hoist.  The strap runs around the boat and as the boat is turned the strap slides through the hook on the hoist chain.
A picture of the bow showing the strap running through the chain hoist hook.  Once the boat was level we added blocking along the building frame to stabilize the hull.
A stern view showing the #4 helm bulkhead and #8 bulkhead which was installed in lue of the transom.  The transom will be fit between the two girders seen in the bottom of the photo. 
Looking forward with the cockpit sole and hatch covers installed.  The shape of the bow is still a work in progress.
 

Completed motor cover with 2' mahogany overy strips. Sealed with penetrating epoxy   Motor cover installed. Portable work table with min...