Starting to frame the cuddy deck. I opted to eliminate the camber which made the framing much easier.
The photo shows the transom in the motor well. The two smaller girders behind the transom were removed as they did not leave enough room for the motor (Honda 60) to turn.
At this point my son came to visit and we ran all the wires for the electrical system.
Got a little behind on photos. The starboard side has received its first layer of 1/4" plywood.
Friday, September 2, 2022
Subscribe to:
Post Comments (Atom)
Completed motor cover with 2' mahogany overy strips. Sealed with penetrating epoxy Motor cover installed. Portable work table with min...
-
Starting to frame the cuddy deck. I opted to eliminate the camber which made the framing much easier. The photo shows the transom in the mo...
-
The hull receives two layers of 6mm marine plywood bonded with thickened epoxy and synthetic staples. The perimeter is screwed with SS scre...
-
Unfortunately during turn over the crew was rather busy and no one thought to take pictures. You can see the upright pole with the chain fr...




No comments:
Post a Comment