Thursday, December 1, 2022

Completed motor cover with 2' mahogany overy strips. Sealed with penetrating epoxy
 
Motor cover installed.


Portable work table with miniature 3" table saw for all those miter cuts.

Laying down the Mahogany overlay strips on the bow.



 Taking La Dame Du Lac to the Motor Dealer to have Honda 60 hp outboard installed.
Motor well was two small and would not allow for proper clearance.  Back to the shop for modifications.

Reframed the opening plus added furring and a new 3/4" plywood overlay.
Frame set up for motor cover. Will Receive two layers of 1/4" plywood and wood trim.

Completed motor cover with 2' mahogany overy strips. Sealed with penetrating epoxy   Motor cover installed. Portable work table with min...